Files
DECNET/development
anti 46775fc0e5 test(profiler/behave_shell): Phase D calibration-grid lockdown + completion log
Widens the binding calibration set from PHASE_ABC_PRIMITIVES (13) to
PHASE_ABCD_PRIMITIVES (17). The four unconditional Phase D primitives
(cognitive_load, exploration_style, planning_depth, tool_vocabulary)
join the per-shard hard gate. The three error_resilience.* primitives
are conditional on at least one errored command in the shard and
tracked in PHASE_D_CONDITIONAL_PRIMITIVES — excluded from the
per-shard required-emission set, included in the cross-class
discrimination check.

cognitive_load empirical re-tune deferred to the next
BEHAVE_CALIBRATION_DIR run; v0.1 thresholds ship.

Phase D completion log appended to BEHAVE-EXTRACTOR.md; Phase D
checkboxes flipped to [x].
2026-05-04 00:03:46 -04:00
..